Rattlechain Advent 21

Let’s open door 21

scan0035

 

pipey 012

The cover up works? In order to fulfil their closure plan for the site, Rhodia hired consultants ERM to undertake an “improvement works”  in 2013- all without really admitting that all the rubbish they had told previously about the site being “harmless” wasn’t.

This firstly involved removal of the iconic waste pipes– a visual distraction in that the waste that it had pumped was still below the water line.

 

 

This entry was posted in Uncategorized. Bookmark the permalink.