Let’s open door 21
The cover up works? In order to fulfil their closure plan for the site, Rhodia hired consultants ERM to undertake an “improvement works” in 2013- all without really admitting that all the rubbish they had told previously about the site being “harmless” wasn’t.
This firstly involved removal of the iconic waste pipes– a visual distraction in that the waste that it had pumped was still below the water line.