Piles

It’s been a slow news week at Rattlechain lagoon and a slow work week at that. The problem is that the site is suffering from piles.

H1280001

Piles of pipework on the south embankment.

H1270003

Piles of wood chips and earth

H1280003

Piles of rubble

 

H1280004

 

Piles of soil being moved around the site

Hopefully Rhodia Solvay will be ale to fix the problem and solve the sites discomfort. There are treatments available but covering the piles over never works- they just don’t go away and the pain gets worse.

 

This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *